Silverthorn Pumping Station Upgrades

 In Infrastructure Renewal

GM BluePlan was retained to undertake various capital improvements at the Silverthorn Pumping Station including construction of a new 2100mm diameter suction header, replacement of low lift pumps 1 and 2 with new 1000hp, VFD controlled pumps and associated instrumentation, control and miscellaneous improvements.

Recent Posts